Been doing more work on the lift, added crush tubes to the pair of legs that didn't have them and welded cross bracing into the top section.
![Free Image Hosting at www.ImageShack.us](http://img641.imageshack.us/img641/6138/20100330202920.jpg)
Not much more to go now. I've got some 3mm ally treadplate to go on the top. I'm not sure if this will be up to the job so I'll probably put some 1/2 inch ply underneath it to be on the safe side.
No comments:
Post a Comment